List of Hydro Projects in Nagaland

List of Hydro Projects in Nagaland with their capacity, location and river on which it is built on.

  • Doyang Hydroelectric Project, Wokha
    • Capacity: 75 MW
    • Location: Doyang, Wokha, Nagaland
    • River: Doyang

Doyang Hydro Project, Wokha, Nagaland

  • Likimro Hydro Electric Project, Kiphire
    • Capacity: 24 MW
    • Location: Moya Village, Pungro, Kiphire
    • River: Likimro
  • Lang Hydro Electric Project, Tuensang
    • Capacity: 1 MW
    • Location: Pangsha village, Noklak,  Tuensang
    • River: Lang
  • Tehok Hydro Electric Project, Mon
    • Capacity: 1 MW
    • Location: Tehok, Mon
    • River: Tehok
  • Ponglefo Hydro Electric project (under construction as on Aug 2016), Kiphire
    • Capacity: 1 MW
    • Location: Kiphire
    • River: Likimro

 

Besides the above hydro projects, the following are some mini and micro hydro projects in Nagaland.

Mini Hydro Project

  1. Duilumreu Mini Hydro Project, Peren

Micro Hydel Projects

  1. Thivopisii Microhydel
    • Inaugrated on 10th May, 2007
    • funded by the Department of Science & Technology, Government of India
  2. Dzüdza MicroHydel
    • Output: 2 X 250 KW
    • Under construction
    • Location: Kohima
  3. Nguiki MicroHydel
    • Output:2 X 100 KW
    • Location: Peren

[More to be added soon…]